This is one of the main machine for grinding the chocolate syrup, it's suitable for grinding Oil-bearing material, fluidness and some chemical raw material, the fine grinding time normally about 10-6 hours, the average fineness is 20-25um. MQM ball milling machine use automatic control system, it has the automatically temperature control and self-cycle filter system, as well as deaeration, deodorizing, dehumidity and breed out steam void etc. It save the power and water, the iron content does not overproof after the syrup been milled, on the other hand, this milling procedure can has the refine purpose, thus the milled syrup has very good taste.
Model |
Max. Volume
(L) |
Fineness degree(um) |
Refine time(hrs) |
Main Power(kws) |
Weight
(kgs) |
Dimension
(LxWxHmm) |
JMJ3000 |
3000 |
20~25 |
18~24 |
55 |
7000 |
3700x1900x2150 |
JMJ1000 |
1000 |
20~25 |
14~20 |
22 |
4250 |
2700x1250x1800 |
JMJ500 |
500 |
20~25 |
14~20 |
15 |
2900 |
2000x1860x1250 |
JMJ50 |
50 |
20~25 |
14~20 |
1.5 |
100 |
200x400x600 |
DELIVERY DATE:
Within 35 days upon the receipt of the down payment
DELIVERY:
Ex. Our Works at Shanghai, China
TERMS OF PAYMENT:
40% by T/T as the down payment, the balance shall be issued a L/C at sight confirmed by the Seller's bank, and to be paid at the presentation of the shipping documents.
OTHERS:
Testing & training:
The plant layout design, assembling and installation, start-up and local team training will be FREE at no cost. But the buyer should be responsible for the round-air tickets, local transportation, board & lodging ,and US$60.-/day/person for the pocket money to our technicians. The testing people will be two persons, and will cost 30 days.
WARRANTY:
The buyer guarantees the quality of the products for 12 months since the date of installation. During the warranty period, any problems/defaults happen on the hard parts of the machinery, the buyer will replace the parts or send the technicians to go to the buyer's site for repairing and maintenance at the seller's cost(FREE). If the defaults are aroused by the defaulted operations, or the buyer needs the technical assistance for the processing problems, the buyer should be responsible for all the cost and their allowance.